3 Product description

VEGABAR 66 • 4 ... 20 mA/HART

36737-EN-130321

Instruments with hygienic fitting are equipped with a gap-free form

seal.

4 … 20 mA/HART two-wire electronics for voltage supply and meas-

ured value transmission on the same cable.
The supply voltage range can differ depending on the instrument

version.
The data for power supply are specified in chapter "Technical data".
The optional background lighting of the display and adjustment

module is powered by the sensor. A certain level of operating voltage

is required for this. You can find the exact voltage specifications in

chapter "Technical data".
The optional heating requires its own operating voltage. You can find

details in the supplementary instructions manual "Heating for display

and adjustment module".
This function is generally not available for approved instruments.

3.3 Operation

The instrument can be adjusted with the following adjustment media:

With the display and adjustment module

with the suitable VEGA DTM in conjunction with an adjustment

software according to the FDT/DTM standard, e.g. PACTware and

PC

with manufacturer-specific adjustment programs AMS™ or PDM

With a HART handheld

3.4 Packaging, transport and storage

Your instrument was protected by packaging during transport. Its

capacity to handle normal loads during transport is assured by a test

based on ISO 4180.
The packaging of standard instruments consists of environment-

friendly, recyclable cardboard. For special versions, PE foam or PE

foil is also used. Dispose of the packaging material via specialised

recycling companies.

Transport must be carried out under consideration of the notes on the

transport packaging. Nonobservance of these instructions can cause

damage to the device.

The delivery must be checked for completeness and possible transit

damage immediately at receipt. Ascertained transit damage or con-

cealed defects must be appropriately dealt with.

Up to the time of installation, the packages must be left closed and

stored according to the orientation and storage markings on the

outside.
Unless otherwise indicated, the packages must be stored only under

the following conditions:

Not in the open

Voltage supply

Packaging

Transport

Transport inspection

Storage

Advertising