Velleman DDPH2 User Manual

Page 4

Advertising
background image

DDPH2

00 (11/12/2012)

4

5. Overview

Refer to the drawing on page 2 of this manual.

# Description

# Description

1 Centre

leg

14 Pulley

2 Outer

leg

15 Retaining hook

3

Caster (with brake)

16 Winch wheel

4 Sliding

yoke

17 Winding drum and brake assembly

5 Positioning

arm

18 Brake lever with spring

6 Backstop

19 Winch wheel handle

7

Main vertical frame

20 Load cradle

8

Telescopic section – inner part

21 Extendable arm with protective caps

9

Telescopic section – outer part

22 Extendable arm pin lock

10 Winch

assembly

23 Cradle mounting head with tilt latch

11 Slide

bar

24 Crossbar with protective caps

12 Slide bar lock

25 Hook for panel support

13 Steel

cable

6. Assembly

The drywall lift is composed of 3 main parts:

o

Tripod base assembly

o

Vertical frame assembly

o

Cradle assembly

Tripod base

 Mount the casters [3] in the tripod base.

 Place the base on its casters [3] and lower the backstop [6].

 Press and hold the ring of the yoke [4] down while unfolding the two outer legs [2], until the

yoke pin snaps into the locking hole near the centre of the tripod.

Figure 1

Vertical frame

 Install the vertical frame [7] in the V-shaped angles on the tripod base. Make sure the frame is

pushed all the way down.

 Attach the handle [19] to the winch wheel [16].

 Move the winch assembly [10] into working position by holding the wheel [16] and brake

handle [18] as shown in figure 2. Push the brake handle all the way up while rotating the wheel

slightly forward, grab the winch arm and secure the brake handle with your thumb to prevent
backlash (figure 3).

Figure

2 Figure

3

Advertising