Powerboard, Installation instructions – Rough Country 75138-15 User Manual

Page 9

Advertising
background image

PowerBoard

®

– Installation Instructions

Rev. Q 0713

75138 / 75143 pg. 9

The trigger wires
are color coded to
match the Door Ajar
wires. Use the Posi-
Taps™ to splice the
trigger wires into the
matching Door Ajar
wires.

Posi-Tap™ Instructions

Insert

Tighten

Strip 3/8"

Insert and

Tighten

Posi-Taps™

Trigger
Wires

2009 – 2012 RAM 1500

2010 – Current RAM 2500/3500

Splice Trigger Wires into
Door Ajar Wires

Replace the connector removed in Step 16. Replace
the wire bundles and fuse box.

Reconnect Fuse Box

Route the long leg of the Wire Harness across the
engine compartment to the passenger side wheel
well. Route the short leg to the driver’s side. Secure
them with 7" Cable Ties.

Route Wiring Harness

On the driver’s side route the Wire Harness down
along the underside of the fl oor and the frame.
Secure it with 7" Cable Ties.

Route Wiring Harness –
Driver’s Side

Wire
Harness

Wire
Harness

Continue to route the Wire Harness along the inside
and top of the driver’s side frame. Secure it with 7"
Cable Ties.

Route Wiring Harness –
Driver’s Side

Wire
Harness

7" Cable
Tie

7" Cable
Tie

Advertising