Rough Country 87308 User Manual

Tj / xj dual steering stabilizer

Advertising
background image

INSTALLATION INSTRUCTIONS

FORM NO. 82275

TJ / XJ DUAL STEERING STABILIZER

1. Remove the stock stabilizer if equipped from the axle and from the tie rod. Retain the factory hardware.
2. Install supplied template and factory bolt in the mount. Lightly tighten to hold in place.
3. Mark as shown in Photo 1 and drill using a 3/8” drill bit.
4. Install the axle bracket in the stock location as shown with the factory hardware and the supplied 3/8” x 1 1/4” bolt

and washer. See Photo 2. Tighten using a 9/16” socket / wrench.

5. Assemble the two brackets with the supplied 1/2” x 2 3/4” bolts and nuts. Do not fully tighten at this time.
6. Install as shown in Photo 3 to the stock tie rod location with the supplied 1/2” nut and washer. Torque to 100 ft/lbs.
7. Install the stabilizer cylinders with the supplied 1/2” x 4 1/2” bolts, washers and lock nuts. Washers must be installed

on 1/2” bolts on the stabilizer cylinders on both sides. See Photo 4.

8. Adjust the brackets as needed and tighten using a 3/4” socket / wrench.
9. Make sure all hardware is tightened before releasing installation.

2-Stabilizer Cylinders
1-87308Bag-Poly Bag
1-Tie

Rod

Bracket

1-Axle

Bracket

87308Bag:

1-1/2” x 2 3/4” Bolt

3-1/2” Top Lock Nuts

9-1/2” Flat Washers

1-1/2” -20 Lock Nut

2-1/2” x 4 1/2” Bolts

1-3/8” x 1 1/4” Bolts

1-3/8” Flat Washer

Photo 2

Photo 1

Photo 3

Photo 4

MARK AND DRILL HOLE

INSTALL HARDWARE

INSTALL TIE ROD MOUNT

INSTALL STABILZER CYLINDERS

CAUTION: Any and all warranties including but not limited to any express warranties, implied warranty of merchant-
ability, or implied warranty of fitness for a particular purpose shall not apply to any product altered in any way outside
the premises of the manufacturer or to any product which is not installed in accordance with the written instructions
provided by the manufacturer for installation of the product.

Kit Contents

Drilling Termplate

Cut Here

Advertising