General installation practices, Tools required – Banks Power Cummins Motorhomes: (Diesel ’03 - 07 ISB-CR 5.9L) Power Pack with EconoMind and Banks iQ w_optional DynaFact Gauges 5.9L (Class-A w_Allison 2000-3000 Trans '03-07), 6.7L (Class-A, All Trans) '07-09 User Manual

Page 3

Advertising
background image

96828 v.4.0

3

Dear Customer,

if you have any questions

concerning the installation of

your Banks EconoMind Diesel

Tuner, please call our Technical

Service Hotline at (888) 839-2700

between 7:00 am and 5:00 pm

(PT). if you have any questions

relating to shipping or billing,

please contact our Customer

Service Department at (888) 839-

5600.

Thank you.

1.

For ease of installation of your Banks

EconoMind Diesel Tuner, familiarize

yourself with the procedure by reading

the entire manual before starting work.

2.

The exploded illustrations provide

only general guidance. Refer to each

section diagram in this manual for proper

instructions.

3.

Throughout this manual, the left

side of the vehicle refers to the driver’s

side, and the right side refers to the

passenger’s side of the vehicle.

4.

Throughout this manual, pushers

refers to the engine in the rear, and

pullers refers to the engine in the front of

the vehicle.

5.

Disconnect the ground cable from the

battery before beginning work. If there

are two batteries, disconnect both.

6.

Route and tie wires and hoses

a minimum of 6 inches away from

exhaust heat, moving parts and sharp

edges. clearance of 8 inches or more is

recommended where possible.

7.

During installation, keep the work

area clean. If foreign debris is transferred

to any Banks system component, clean it

thoroughly before installing.

8.

The Banks iQ displays a green

indicator light when the battery is fully

charged. If an orange light is displayed,

the Banks iQ can be charged with the

supplied ac-outlet wall charger. Locate

the supplied ac outlet wall charger, also

located in your kit and plug the charging

cord into Banks iQ. Please refer to the

Banks iQ DashBoard Pc, Owner’s Manual

for additional instruction.

Tools Required:

• 1⁄4” or 3⁄8” drive ratchets with inch

and metric sockets
• Inch and metric combination

wrenches
• Pliers
• Wire cutters
• Wire strippers
• Drill motor
• 1⁄8” Unibit, 3⁄8” Unibit, 1⁄8”, 3⁄16”, 7⁄16”

drill bits
• Tap handle
• 1⁄4“ NPT tap
• Foot-pound torque wrenches
• Penetrating oil or light

lubricant spray
• Heat gun

This product is only for

motorhomes with a 5.9/6.7L

Cummins ISB engines with

Allison 5-speed 2000MH series or

Allison 6-speed 3000MH series

transmissions.
Make sure your system part

number is compatible with your

vehicles transmission. Refer

to title page for part number/

Transmission compatibility.
There is a tag affixed to the

transmission, on the driver’s

side. This will help you to

determine if you have the correct

transmission.

General Installation Practices

Advertising