Danze DF022230 - Installation Manual User Manual

Page 4

Advertising
background image

5

6

6. Use a pencil to mark on the finished wall the
location of the wall anchor holes that are on the
back of the vanity (A).

7. Move vanity (A) away from the wall and drill
5/16” holes for plastic anchors (C) using 5/16”
drill bit
.

8. Press plastic anchors (C) into the holes
until they are flush against the surface. Use a
hammer if necessary.

2. Measure and mark with a pencil on the back
of your vanity (A) the location of the water
pipes and drain lines coming out of the wall.

3. Move vanity (A) away from the wall and cut
pipe holes on the back of the vanity (A) using a
hole saw.

4. Move the vanity (A) back to the intended in-
stallation location, flush against the wall.

5. Check the top of the vanity (A) for level front
to back and side to side. Adjust the height level-
ers on the bottom of the vanity (A) to achieve
level if necessary.

Advertising