Attach boom assembly to the turret, Attach adjustable tie rod to the boom and turret, Trolley – Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-1783 User Manual

Page 13

Advertising
background image

3. Installation

PNEG-1783 Jib Crane for Bucket Elevators

13

Attach Boom Assembly to the Turret

Insert pivot pin through the turret and the boom assembly and fasten in place with the cotter pins as shown
in

Figure 3F

.

Figure 3F

Attach Adjustable Tie Rod to the Boom and Turret

Install clevis pin through the tie rod arm and turret bracket. Place other clevis pin through the tie rod arm
and boom bracket. Fasten both clevis pins in place with a cotter pin on each side.

Trolley

Refer to manufacturers instructions supplied with trolley.

Advertising