72' high wind roof assembly instructions – Grain Systems Bin Accessories PNEG-1863 User Manual

Page 15

Advertising
background image

3. 72' High Wind Roof Assembly Instructions

PNEG-1863 Special High Wind 72' Roof Assembly

15

Figure 3E

* NOTE: The upper middle purlin and lower purlin have the top flange coped to allow flush installation with the top
of the beam.

1. At the upper middle purlin location bolt the purlin to the beam utilizing the large purlin clip (CRP-5054) and 1/2" x 1-1/2"
hex bolts with washers under the nuts on both sides.
2. At all other purlin locations utilize 3/8" x 1-1/2" hex flange head bolt with a washer under the nut to bolt the small purlin

clip (CRP-5029) to the purlin. The purlin clip will bolt to the beam with a 1/2" x 1-1/2" hex head bolt.

See detail 7
below

* See note below

Advertising