Installing the sidedraw discharge chute – Grain Systems Tanks PNEG-4078 User Manual

Page 149

Advertising
background image

Chapter 8: Accessories

E

Measurement from edge of sidewall sheet
to center line of baffle chute, 75 in. (190.5
cm)

K

Typical spacing, approximately 8 in. (20.32 cm)

F

Inside of bin

8. Tighten hardware to the recommended torque specifications. See

Bolt Torque Specifications, page

24

.

Installing the Sidedraw Discharge Chute

The following instructions discribe the installation of the sidedraw discharge chute.

What You Should Know
Field cutting is required to create the opening for the discharge chute. Cutting the opening will require two
sidewall panels to be modified.

1. Find the column of bolt holes (A) located on either side of the last baffle chute (B). Measure approxi-

mately 11 in. (27.94 cm) (C) inward on the last baffle chute (B), and place a mark or scribe.

2. Repeat this procedure from the opposite column of bolt holes (A), creating the center line (D) on the

baffle chute (B), and transfer this center line (D) onto the sidewall panel.

Pneg-4078 78 Ft Diameter 40-Series Bin

149