PowerWalker Battery Pack for VI 1000_1500RT LCD User Manual

Page 30

Advertising
background image

EN


6.5 Testing New Batteries

For a battery test, please check:

The batteries must be fully charged.

The UPS must be in Normal mode with no active alarms.

Don’t take on/off the load.


To test batteries:

1. Connect the UPS to utility power for at least 48 hours to charge the batteries.

2. Press and hold the

button 10 seconds to start the battery test. The status

display string shows “TEST”




6.6 Recycling the Used Battery:

Warning:

Never dispose the batteries in a fire. It may explode.

Do not open or mutilate the batteries. Released electrolyte is harmful to

the skins and eyes. It may be toxic. A battery can present a risk of electrical
shock and high short circuit current.

To recycle properly the used battery, please do not discard the UPS, battery
pack and batteries into the trash bin. Please follow your local laws and
regulations; you may contact your local recycling waste management center
for further information to dispose properly of the used UPS, battery pack, and
batteries.


Advertising