5. Installation and Initial Startup

Before installation, please inspect the unit. Be sure that nothing is damaged

.

I: Placement & Storage Conditions

Install the UPS in a protected area that is free of excessive dust and has adequate air flow around the unit,

and is free from excessive dust, corrosive fumes and conductive contaminants. Please place the UPS away

from other units at least 20 cm to avoid interference. Do NOT operate the UPS where the temperature

exceeds 0-40° C and the humidity is over 0-90 % RH.

II: Connect to Utility and Charge

Plug in the AC input cord to the 2-pole, 3-wire grounded wall outlet. For the best results, we suggest charging

the battery at least 6 hours with no load (no electrical devices such as computers, monitors, rtc.) connected

before initial use. The unit charges its battery while connecting to the utility.