Peerless-AV ACC800 - Installation User Manual

Ab a, Parts list

Advertising
background image

ISSUED: 08-21-01 SHEET #: 100-9003-5 06-29-05

Visit the Peerless Web Site at www.peerlessmounts.com

For customer service call 1-800-729-0307 or 708-865-8870.

1 of 1

© 2004 Peerless Industries, Inc. All rights reserved.
Peerless is a registered trademark of Peerless Industries, Inc.
All other brand and product names are trademarks or registered trademarks of their respective owners.

Installation and Assembly - Cord Management Adapter to be used with

Armor Lock Box

Model: ACC 800

Some parts may appear slightly different than illustrated.

IMPORTANT! Read entire instruction sheet before you start installation and assembly.

Before you start make sure all parts listed are included with your product.

QTY.

DESCRIPTION

PART NO.

A

1

cord management adapter

580-1020

B

1

#10-32 x 3/8 socket pin screw

520-1084

C

1

1.5 x 6.6” vinyl (not shown)

600-1004

D

1

#10-32 x 3/16" slotted set screw

520-1187

Parts List

Thread cords through top of extension column and pull cords through hole in cord management adapter (A) as
shown below. Note: Make sure cords are long enough to reach back of projector and not binding.

A

B

Extension Column

(UL Listed EXT or ADJ Series)

Sold Separately

A

B

A

existing
screw

A

Armor Lock Box

(Sold Separately)

D

D

existing
set
screw

Thread cord management adapter (A)
between extension column and Armor
Lock Box. Secure the cord manage-
ment adapter (A) at top by aligning one
of the four holes in the cord manage-
ment adapter (A) with the notch in the
extension column using screw (B).
Note: Slotted set screw (D) is used to
jam against the threads of extension
column to prevent any excess move-
ment. Do not overtighten screw;
overtightening screw will damage
threads making it difficult to separate
the products.
Secure the cord management adapter
(A) at the bottom by aligning one of the
four holes in the Armor Lock Box with
the notch in the cord management
adapter (A). Note: The screws used
for this attachment were provided
with the Armor Lock Box.
Vinyl wrap
has been supplied to cover any ex-
posed threads on extension column.

A

A

Advertising