ISSUED: 6-5-95 SHEET NO: 128-9004-7 08-05-11

Cut tie wire (

G) into four pieces of equal length. Insert wires through ends of turnbuckles. Twist each wire around

itself at least four times.
Drill holes for four ceiling anchors (see “Various Anchoring Methods"). Position the holes so that when the tie

wires (

G) when attached and taut will angle out at 15

O

. Drill a fifth anchor hole directly above the

center of the

ceiling tray.
Pull tie wires tight and attach to ends of ceiling anchors (or truss). Again twist each wire around itself at least four

times.
When this step is complete, the weight of the ceiling tray should be supported by the tie wires.
Note: 20’ (6.1 m) of tie wire (G) is provided. If space between the true ceiling and suspended ceiling is more than

36" (914 mm), additional wire (12 gauge annealed, steel, black) will be needed.

VARIOUS ANCHORING METHODS (Max. UL Load Capacity : 250 lbs. (113 kg)

Wood Joists or Beams

Drill 5/32" (4 mm) dia

holes 2" (51 mm) deep.

Fully insert eye bolts (

K).

Solid Concrete

Drill 1/4" (6 mm) dia. holes 1.5" (38 mm)

deep. Hammer in Concrete Anchor (

L) using

Rawl #3250 setting tool or equivalent.

K

L

Truss Ceiling

No anchor required. After at-

taching tie wire to turnbuckle

loop upper end around ceiling

truss. Pull tie wire tight and

twist it around itself at least

four times.

• Installer must verify that the ceiling will safely

support four times the combined weight of all

attached equipment and hardware.

WARNING

A

G

G

G

G

DETAIL 1

Ceiling Runner

DETAIL 2

Safety Cable and

Cable Clamp.

H

J

H

Knockout panels are provid-

ed for electrical outlet boxes

and antenna leads.

Run the safety cable (

H) through the remaining

ceiling anchor. Pass each end through holes in

ceiling plate reinforcements and join with cable

clamp (

J). DO NOT TIGHTEN YET!

Suspended Ceiling Kit installation is now com-

plete. After all components (Jumbo Mount, Ex-

tension Column, etc.) and equipment (monitor,

VCR, etc.) have been attached, tension the tie

wires by adjusting turnbuckles (

F). Load must

be carried by tie wires - not suspended ceil-

ing runners. Finally, take up the slack in safety

cable

(H) leaving it slightly loose. Tighten both

safety cable clamps (

J).