Cable Management

NOTE: Make sure cables have enough slack to
allow full movement of the arm.

Run power cable through top or bottom of arm (A)
and signal cable(s) through other side of arm in
order to avoid interference with the signal. Lock
cables into place by snapping cable covers (J &
K
) onto mount as shown. Screen may have to be
moved for easy access.

Optional: If additional cable management is
required route cable ties (G) through slots of arm
(A) as shown in detail 3.

8

K

J

A

G

CABLE

DETAIL 3

SLOT

Snap wall plate covers (F) to top and bottom of wall
plate rails as shown.