Illustration b illustration c, Detail 3 – Peerless-AV PLB-1 - Installation User Manual
Page 5
5
5
5
5
5 of 55555
ISSUED: 04-22-03 SHEET #: 201-9046-5 04-20-10
Visit the Peerless Web Site at www.peerlessindustries.com
For customer service call 1-800-729-0307 or 708-865-8870.
Hang each plasma screen on interface bracket (A) as shown in Illustration B. Adjust tilt as desired for each
screen and tighten eight M10 x 15 mm penta-pin screws (C) on interface bracket (A) using M10 x 2" penta-pin
tool (F).
E
After both screens are installed, lock interface bracket (A) into
place using one #8 x 3/8" truss head sheet metal screw (E) as
shown in Illustration C and detail 3.
Note: Make sure both screens are installed properly before
locking interface bracket (A) into place.
Illustration B
Illustration C
A
Detail 3
C
© 2007, Peerless Industries, Inc. All rights reserved.
All other brand and product names are trademarks or registered trademarks of their respective owners.