Peerless-AV ADD101-110 - Installation User Manual

Warning, Part list c a a

Advertising
background image

ADD101, ADD102,

ADD103, ADD104,

ADD105, ADD106,

ADD107, ADD108,

ADD109, ADD110

IMPORTANT! Read entire instruction sheet
before beginning installation and assembly.

Installation and Assembly - Fixed Length Extension Columns

Models:

Remove plug used for shipping from pipe (A). Align holes to desired length, then fasten with a M10
carriage bolt (B) and M10 lock nut (C).

Insert extension column to I-Beam Clamp. Align holes to desired length, then fasten with a M10
carriage bolt (B) and M10 lock nut (C).

Follow directions supplied with mounting bracket for attaching to threaded end of column. Align slot
with one hole inside of threaded fitting. Lock extension column with one M5 x .8" x 10mm phillips
screw supplied with mount column attaches to.

I-Beam Clamp

I-Beam Clamp

B

ISSUED: 06-30-00 SHEET #: 154-9003-3 10-26-04

Visit the Peerless Web Site at www.peerlessindustries.com

For customer service call 1-800-729-0307 or 708-865-8870.

1 of 1

Note: Other ceiling decouplers
may be used if mounted to a
structure other than an I-Beam
(Call Customer Service for more
information).

A Pipe (ADD101)

1

154-1079

Pipe (ADD102)

1

154-1080

Pipe (ADD103)

1

154-1081

Pipe (ADD104)

1

154-1082

Pipe (ADD105)

1

154-1083

Pipe (ADD106)

1

154-1084

Pipe (ADD107)

1

154-1085

Pipe (ADD108)

1

154-1086

Pipe (ADD109)

1

154-1087

Pipe (ADD110)

1

154-1088

B M10 x 60mm carriage bolt

2

580-1022

C M10 center lock nut

2

530-9402

Description

Qty.

Part #

Part List

C

A

A

© 2004 Peerless Industries, Inc. All rights reserved.
Peerless is a registered trademark of Peerless Industries, Inc.

B

C

• For a safe installation be sure to lock extension

column as instructed.

WARNING

• For safety, extension column must be locked to

threaded fitting with screw!

WARNING

Advertising