Newport Brass 1-570 User Manual

Page 2

Advertising
background image

Figure 3

7

8

10

6

Spout Installation

Slide spout base RING (6) onto SPOUT (8).

Thread diverter ROD (7) onto KNOB (10). Slide ROD (7) through SPOUT (8).

Place SPOUT (8) over VALVE (4). Rotate KNOB (10) to thread lower end of ROD

(7) to VALVE (4). Secure into place with SETSCREWS (9), 3 places.

Slide base RING (6) down and flush with deck. See Figure 3.

We recommended Installation of this product by a Professional Plumbing Contractor

Note: Use plumbers tape or equivalent to seal all threaded joints.

Warning: To prevent severe damage to valve body, any solder/braze process

must be performed a min. of 4" from ports.

It is strongly recommended that an access panel(s) is built into the roman

bath surround. Access panels allow for ease of trim installation and future pos-

sible repairs.

Diverter Installation

(

Finished Deck (Standard) Installation)

Note: Intended for surfaces up to 2-1/2” (63.5mm) thick.

Drill 1-1/2” (38mm) hole in deck.

Loosen SCREWS (1) until cardboard TUBE (2) is free. Rotate WASHER (3) 90°

and remove. Remove cardboard TUBE (2) and discard. See Figure 1.

Diverter protective COVER (5) should remain on Diverter until spout is ready to

install. (Remove by dis-engaging set screw.)

Install Diverter (4) through hole from underside of deck. Note: Hot side of end

valve is labeled. Replace WASHER (3) and rotate 90° to expose SCREWS (1).

Secure into place by tightening SCREWS (1). See Figure 2.

1

2

5

3

4

3

4

1

Figure 1

Figure 2

4

Valve Installation

Place flange NUT (1) on valve BODY (2).

Insert BODY (2), (blue cold & red hot), through hole from below mounting sur-

face.

Adjust and secure with inverted flange NUT (3) so that the top of valve stem is

1-3/4” above the mounting surface. See Figure 4.

Deck Flange Installation

(The maximum distance between mounting holes is 18”.)

Attach deck FLANGE (4) onto NIPPLE (5).

Insert NIPPLE (5) through hole in mounting surface.

Place rubber WASHER (6), brass WASHER (7) and flange NUT (8) onto NIPPLE

(5) and tighten.

Attach plastic SLEEVE (9) onto end of NIPPLE (5). See Figure 5.

Figure 4

Finished Deck

Ø1-1/4”

3/4” NPT

1-3/4”

2

3

1

Figure 5

7

8

4

5

6

7

Ø1-1/4”

9

NWP-1-570

Advertising