Recommended Installation by a Professional Contractor

1. Using the table below, measure the appropriate distance between post centers. See

Fig. 1. Note: Hole locations should be level.
· 18" Single Towel Bar - 18 13/16"
· 24" Single Towel Bar - 24 13/16"
· 30" Single Towel Bar - 30 13/16"
· Tissue Holder (2 Post) - 6 1/4"
· Tissue Holder (3 Post) - 6 1/4" (2x), See Fig. 2.

2. Drill hole(s) in wall at points marked using the appropriate drill size:

· Wood Screw (#6 x 2”) - use: 3/32" Drill
· Toggle Screw (6-32 x 3”) - use: 3/8" Drill

3. Fasten FLANGE (1) to wall using either WOOD/TOGGLE SCREW (2). See Fig. 3.

4. Place ESCUTCHEON (3) over FLANGE (1). See Fig. 4.

5a. Towel Bars: Assemble TOWEL BAR (6) to END POST (5). Place END POST (5)

onto FLANGE (1) and secure into place with SETSCREW (4). See Fig. 5.

5b. Towel Ring / Robe Hook:

P

lace END POST (5) onto FLANGE (1). Secure into

place with SETSCREW (4). See Fig. 6.

5c. Tissue Holder (2 & 3 Post): Place END POST (5) onto FLANGE (1) and

secure into place with SETSCREW (4). Place HOLDERS (7) between END POST
(5). See Fig. 7.

Towel Bar / Towel Ring / Robe Hook / Tissue Holder

Installation Instructions

Model No.

16-01, 16-02, 16-03, 16-09, 16-12, 16-28, 16-29

Distance between

posts

Fig. 1

Fig. 2

Fig. 3

2

1

3

Fig. 4

Fig. 5

Fig. 7

1

4

4

5

7

5

5

1

Distance
between

posts

Distance
between

posts

1

1

1

5

6

4

Fig. 6

1

5

Advertising