R&M Materials Handling ELECTRIC CHAIN HOISTS LoadMate Chain Hoist LM 10 User Manual

Page 22

Advertising
background image

LM10 I&M MANUAL/EN/11.30.2010




22/85

This document and the information contained herein, is the exclusive property of R&M Materials Handling, Inc., and represents a non-public, confidential and proprietary trade secret
that may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of R&M Materials Handling, Inc.
Copyright © (2010) R&M Materials Handling, Inc. All rights reserved.

6.3.3 Procedure to adjust swivel trolley guide rollers

1. Loosen nut “A” (8 plcs).
2. Adjust guide rollers the maximum distance away from beam.
3. Place swivel trolley on beam.
4. Move trolley to curve section of beam.
5. Adjust guide rollers allowing approximately 3/16” (4-5 mm) clearance per side using screw “B.”
6. Tighten nut “A” (8 plcs).

Figure 8. Swivel trolley guide rollers

NOTE: Adjustments should be made with swivel trolley in radius of monorail.

Advertising