11 50/50 POP-UP INSTALLATION

Apply a small bead of plumber’s putty underneath the Flange (11A) and place

a ring of putty around Drain Opening (11B) of sink. Use PTFE plumber’s tape

to all threaded fi ttings according to manufacturer’s instructions. Insert Flange

(11A) into Drain Opening (11B). From underneath, insert Rubber Washer (11C)

and Friction Washer (11D) over the bottom of Flange (11A). Thread Locknut

(11E) until Rubber Washer (11C) seats securely inside Drain Opening (11B).

Thread Drain Body (11F) to bottom of Flange (11A). Hand tighten and adjust

the Drain Body so that the Ball Rod Opening (11G) faces the rear. Wrench

tighten Locknut (11E) and wipe excess putty.

12 BALLROD ADJUSTMENT

Drop the Stopper (12A) into the Drain Body (12B) from the top with the Off-Set

(12C) facing rear. From below, insert the Ball Rod (12D) into the Ball Rod Opening

(12E) through the Stopper Hole (12F) and secure with the Nut (12G).

13 POP-UP ROD LINKAGE & ADJUSTMENT

Place one end of Spring Clip (13C) on end of Ball Rod (13B). Insert Ball Rod

(13B) across and through hole in Strap (13D). Secure other end of Spring Clip

(13C). Insert bottom of Lift Rod (13A) into hole at top of Strap (13D). Tighten

with Thumb Screw (13E). Adjust Lift Rod (13A) function by adjusting location of

Thumb Screw (13E) along the Strap (13D), or by adjusting the hole in which Ball

Rod (13B) goes through Strap (13D). Be sure to leave enough space between

Lift Rod Knob (13F) and Spout Hub (13G) when Lift Rod is down.

14 UNIT START UP

Turn on hot and cold water supplies, and check for leaks above and below

the sink.

11

12

13

14

4

ENGLISH

11A

11C

11B

11E

11D

11F

11G

12A

12B

12C

12E

12D

12D

12G

12F

13A

13F

13A

13E

13E

13D

13D

13C

13C

13B

13B

13G

Advertising