Buyers BP200 User Manual

Installation instructions

Advertising
background image

Quality since 1946

9049 Tyler Blvd. • Mentor, Ohio 44060

Phone (440) 974-8888 • Fax (440) 974-0165

Toll-Free Fax 800-841-8003 • buyersproducts.com

Installation Instructions

BP200 25-Ton Pintle Hook

WARNING

Maintain adequate vertical (tongue) load to prop-

erly control the trailer (generally 10%) but do not

exceed the above rated capacities.

WARNING

It is the user’s responsibility to be sure that the pin-

tle hook mounting surface is capable of 6,000 lbs.

vertical load and 50,000 lbs. gross trailer weight.

Towing Applications

Use with trailers and equipment designed for over
the road towing within the stated capacities.

Use

only with nonswivel-type drawbar. This pintle
hook is ideal for use in the utility and construction
industries. For off-road applications, reduce the
stated capacities by 25%.

Drawbar Eye Dimensions

2-3/8" to 3" I.D. with 1-1/4" to 1-5/8" diameter section.

Mounting

1. Use a mounting structure of sufficient strength

to support the rated capacity ot the pintle hook in
accordance with S.A.E. J 849B.
2. Use the hole pattern shown on the reverse.
3. Remove the cotter pin, nut, washer, spring and

both flanges.
4. Install flanges using 6-1/2" grade 8 bolts prop-

erly tightened.
5. Install pintle, spring, washer and nut. Tighten

nut to slightly compress spring. Install cotter key
in nut castellation. Spread cotter pin.

Operating Instructions

1. Before operating, check for proper operation,

worn, damaged or missing parts and secure
mounting. Correct flaws before use.
2. Move pintle to correct coupling position as

shown above. (Latch on top)

3. Open latch by removing safety pin and lifting lock.
4. Lower drawbar eye over the horn of the pintle.
WARNING: Do not damage the latch. Be careful
with the drawbar when coupling or uncoupling.

5. Close latch and insert safety pin.
WARNING: Other steps and inspections are

also required. Consult D.O.T. regulations and

American Trucking Association for complete
coupling and uncoupling procedures.

Maintenance

For proper performance, perform the following every
3,000 miles or 3 months, whichever comes first.
1. Clean and inspect for proper operation.
2. Inspect, in particular, the coupling area. Replace

when wear exceeds 1/8" (.125") from the original
surface profile.
3. Inspect for worn, damaged or missing parts.

Replace as required.
4. Regularly lubricate latch and lock pivots with

a light oil lubricant.
5. Check the mounting bolts for proper torque.

Capacity

6,000 lbs. Maximum Vertical Load
50,000 lbs. Maximum Gross Trailer Weight

Advertising