Position Switch Kit for Retrofill CB

DEH-41530 02/12

AKD-6—Position Switch Actuator

Description

Position switch actuator bracket can be installed on all versions of Retrofill EntelliGuard ACB for AKD6 LVS. Steps for
installing are below:
Retrofills use the legacy position switch already mounted in the cubicle. If a new position switch has to be installed,
refer to legacy position switch installation manual.

Installation

1. Unpack the position switch bracket. Each bracket is provided with a pair of M6X16mm Allen-type bolts

and washers.

2. Place the bracket on the bottom right side of the AKD6 base. 2 locating holes are provided for mounting

of the position switch bracket.

3. Fasten the 2 bolts to the locating holes after placing the washers so securely mount the bracket
4. The bracket is ready for use.
Note: Individual hardware for the position switch actuator cannot be ordered separately. The item numbers given below
are for reference only (

Table 4

). The assembly comes as a unit or a kit. Order the actuator assembly by part number.

Table 4. AKD-6 Position Switch Actuator Components

Level

Item or Part Number

Description

Quantity

1

10105289P1

POSITION SWITCH BRKT, AKD6

1

1

10100950P4

WASHER M6

2

1

10100380P1

SERRATED BELLEVILLE WASHER M6

2

1

10100545P1

CAP HEAD SCREW M6X16

2

Advertising