Product Description

These instructions describe the installation
procedure for the integral handle operator accessory,
type TDR, on

Record Plus™

FE250 circuit breakers,

as illustrated in Figure 1.
The type TDR handle is designed for direct
mounting to the breaker in either vertical (cat. no.
FENRC and FENRCI) or horizontal orientation (cat.
no. FENRD). A door ring on the handle operator
projects through a hole in the front of the enclosure
door. These handles are suitable for use with NEMA
1, NEMA 12 enclosures.
An interlock kit (cat. no. SEFRDRCK) for adapting
the enclosure door and the door ring gasket (cat. no.
SEFRGSK) are available separately for FENRCI and
FENRD.

DEH41028




Step 1 – Unpack and Inspect

Unpack the integral handle operator kit and inspect

the parts for any shipping damage. Verify that all

parts are supplied, as listed in Table 1.
Note that the numbers in brackets in the following

Figures and installation instructions refer to the item

numbers in Table 1.

Item Description

Qty.

1 Operator

assembly 1

2 7/16”

spacer

2

3 L

bracket

1

4 Lock

washer

4

5 #10-32x3-3/4”

screw 2

6 Grounding

cable

1

7 41/64”

spacer

2

8 #10-32x4”screws

2

9 SEMs

screw

1

Table 1. Parts supplied in the type

TDR integral handle operator kit.

Step 2 – Installation

Use the following procedure to install the handle

operator kit to the circuit breaker. Outline drawings

showing the dimensions of the installed operator are

found in Figure 7.

1.

Push the trip button to place the breaker

operating handle in the TRIP position, as

illustrated in Figure 3

2.

Mount the breaker to the enclosure with two

7/16”spacer [2], one L-bracket [3], two lock

washers [4] and two #10-32 x 3-3/4" screws [5],

as shown in Figure4. Tighten the screws to 27 -

32 in-lb.

3.

Turn the rotary handle in the handle operator

assembly [1] to the TRIP position. Mount the

operator assembly to the breaker with a

grounding cable [6], two 41/64” spacers [7], two

#10-32

x

4" screws [8] and two lock washers [4],

as shown in Figure5. Tighten the screws to 27 -

32 in-lb.

Figure 2. Locking the circuit breaker OFF.

Padlock

Slot

4.

Secure the handle operator assembly [1] to the

L bracket [3] with the SEMS screw [9], as shown

in Figure 6.

Use the identical procedure to install the horizontal-

mount rotary handle, as shown in Figure 10

.





Step 3

-

Handle Operation




Complete the installation of the circuit breaker

according to installation instructions DEH40360.

The mechanism operates with a rotary motion from

the OFF/RESET position to ON.




In FENRCI/D, when the breaker is ON, the

interlock arm prevents the enclosure door from

opening. If it is necessary to open the door with the

breaker ON, turn the interlock defeat screw

clockwise to disengage the interlock arm.

To lock the handle in the OFF position, pull the

hasp out of the end of the handle and through the

slot in the door ring, as shown in Figure 2. Insert a

padlock through the slot in the hasp to prevent the

handle from rotating. The locking hasp accepts up

to three padlocks with 1/4-inch shanks.