GE Industrial Solutions Double-Throw Safety Switch, NEMA 1 User Manual

Page 2

Advertising
background image

8. Wire Phase A, B and C of Line 2 as shown.

Refer to rating label inside switch for Line lug
tightening torque. Wire Line 2 only in the direction
indicated by the arrow.


9. Re-check all electrical connections.

Ensure that all electrical connections are tightened
to the proper torque before energizing the safety
switch.

10. Close door.

Close the door and ensure that latch A (see Step 2) is
engaged.

How to use the interlock defeat feature

WARNING: Hazard of electrical shock or
burn. The interlock defeat allows the door
interlock to be overridden and the door to
be opened when the switch handle is in the
ON position. This should only be done by
qualified electrical contractor and/or
licensed electrician.

IN PREPARATION FOR OPENING THE

ENCLOSURE DOOR, USE APPROPRIATE NFPA
70E PERSONAL PROTECTIVE EQUIPMENT (PPE).

• Insert the end of an appropriately sized blade-

type screwdriver through Slot A and into Slot B.
Using the side of the screwdriver blade, engage
the tab in the direction of the arrow shown in
the diagram below to release the interlock.

• Open the door.

NOTE: Accessories and replacement parts are listed on

the label inside the safety switch door.

GE Consumer & Industrial

41 Woodford Avenue

Plainville, CT 06062

www.geelectrical.com

DEH-44153

Advertising