Step 2 – install the breaker operating mechanism – GE Industrial Solutions Record Plus TDM, NEMA 4__4X: FE250 User Manual

Page 3

Advertising
background image







Step 2 – Install the Breaker

Operating Mechanism.




t




Dir

1. Move the breaker handle to the OFF position.
2. Mount the breaker to the enclosure with

#10-32 X 3 5/32 " screws [1], as illustrated in Figure 3.
Tighten he screws to 27 - 32 in-lb. Complete the
installation of the circuit breaker according to
installation instructions DEH40360.






























3. FENRM2

ect Mounting -

(Refer Figure 9 for outline views of completed
installations with dimensions).
a. Place the base-crank assembly [2] on the breaker,

as illustrated in Figure 4.

b. Insert the four #10-32 x 1/2" screws [4] through

the mounting holes in the base and into the
heads of the breaker mounting screws [1], with
the grounding wire [3] attached to one of the
screws.

c. Tighten the screws to 27 - 32 in-lb. Secure the

other end of the grounding wire to a suitable
ground location.


4. FENRM4 Door Mounting- -

(Refer Figure 10 for outline views of completed
installations with dimensions).
a. Place the base-crank assembly [5] on the breaker,

as illustrated in Figure 5.

b. Place the coupler (6) on to the crank in the base

asm (5) and fasten by screw, #8-32 x 5/16" (7), as
illustrated in Figure 6. Tighten the screws to 16 -
20 in-lb

c. Measure the distance from the breaker-mounting

surface to the handle-mounting surface, H, as
shown in figures 7 & 10.

d. Cut the handle arm [8] to the length L given by

L =H –5 29/32 inch (150 mm), as illustrated in
Figure 7 & 8.

e. Attach the handle arm [8] to the coupler [6] with

#8-32 x 5/16" screws [7], as illustrated in Fig6.
Tighten the screws to 16 - 20 in-lb.

Figure 4. Mounting the FENRM2 assembly onto the

breaker

[1]

Figure 3. Mounting the breaker in the enclosure.

[1]

[2]

[4]

[3]

DEH41027

Advertising