GE Industrial Solutions Spectra Series Power Panelboards ATHMEGNDN User Manual

Page 2

Advertising
background image

5. Attach the wire to neutral and ground

. Cut and strip

the free end of the ground cable and attach to the
equipment ground, as shown in Figure 3. Note that an
AEG10 ground [3] is supplied with this kit that should
be installed with the instructions provided. If there is
an available ground that will accept a #2 cable, then
discard item [3]. Select the lughole closest to the
TVSS unit. Do the same for the neutral (if
applicable), as shown in Figure 4. Tighten the lug
screws to the torque levels specified on the component
labels.

Figure 3. Attach the #2 ground cable to the AEG10 equipment

ground.

Figure 4. Attach the #2 neutral cable to the equipment neutral.

g

GE Industrial Systems

General Electric Company
41 Woodford Ave., Plainville, CT 06062

DEH40471 R02 1001

© 2001 General Electric Company

These instructions do not cover all details or variations in equipment nor do they provide for every possible contingency that
may be met in connection with installation, operation, or maintenance. Should further information be desired or should
particular problems arise that are not covered sufficiently for the purchaser’s purposes, the matter should be referred to the
GE Company.

AEG10

Equipment

Ground Bar

#2 Copper

Ground

Wire

Equipment

Neutral

#2 Copper

Neutral Wire

Advertising