GE Industrial Solutions EntelliGuard G Cluster pad ANSI _ UL Envelope 1, drawout upto 2000A User Manual

Entelliguard, Circuit breaker, Accessories

Advertising
background image

Cluster Pad Assembly, ANSI / UL
Envelope 1, drawout upto 2000A

Cluster pad assemblies are supplied with the
Entelliguard breaker.




























EntelliGuard

®

G

Circuit Breaker

Accessories

Cluster pad Assembly



WARNING: Before installing any accessories, turn the
breaker OFF, disconnect it from all voltage sources,

and discharge the closing spings.




AVERTISSEMENT: Avant d’installer tout accessoire,
mettre le disjoncteur en position OFF, le déconnecter

de toute tension d’alimentation, et décharger les

resorts d’armement


Cluster pad Assembly mounting Procedure:

1. Turn the breaker off and discharge the closing springs

by depressing the OFF and ON buttons in the
sequence OFF-ON-OFF. Verify that the breaker OFF-
ON indicator shows OFF on a green background and
that the charge indicator shows DISCHARGE on a
white background. If installing in a draw-out type
breaker remove breaker from adaptor (cassette)
before continuing


2. Assemble the Cluster pad assembly on the breaker

top & bottom rear terminals & orient them as shown
in Fig A.


3. Tightened the cluster pad assemblies on bottom & top

breaker terminals with torque of 80Nm (59 ft-lbs) as
shown in fig A.









DEH-41450 Installation Instructions

M12 Hardware
80 Nm Torque

M12 Spring
Washer

M12 Plain
Washer

Cluster Pad
assembly

Nut plate

M12 Hardware
80 Nm Torque

M12 Spring
Washer

M12 Plain
Washer

Cluster Pad
assembly

Nut plate


Envelope Size Catalog #

Envelope 1

Cluster pad

GBB120TBD

Fig A. Envelope 1, Cluster pad assembly
(Upto 2000 Amperes, drawout)

Table 1 Cluster

Fig B. Envelope 1 Cluster pad assembly, Side View

pad catalog numbers

1

Advertising
Table of contents