Preparation of the Drive for Installation
Remove 7 torx screws on the top of drive.
See Figure 4.
Install the top duct cover plate as shown
in Figure 5 using the new 16mm, M5 torx
screws provided with the kit.
Figure 4. Screws to be removed from top of drive
Figure 5. Top cover plate installed