INSTALLATION:

Before attempting installation, make sure that the pre-installation requirements of this manual

have been satisfied. If the status of the pre-installation requirements are not known, do not

attempt to continue.

1.

MOUNTING

GE TR7000 A-Series Panel Extension SPD units are designed to be installed on GE A-Series

electrical service panels. These instructions shall be considered as the general guidelines to

insure that the SPD is installed safely, while providing the maximum amount of surge

protection available. Before making connections to the unit, verify that the unit model

number, voltage rating and ampere ratings are appropriate for connection to the intended

power source. See page 7 for Voltage Ratings and Power Source Configurations.

Select a breaker location that will allow for a minimum length of wire between the SPD

power terminals and the electrical service panel.

2.

POWER CONNECTIONS

Mechanical terminals are provided on the SPD for connection to the electrical power system.

These terminals will accommodate #14 to 2/0 AWG stranded copper conductors. The

minimum recommended wire size for the GE TR7000 SPD is # 6 AWG. See page 10 for

terminal location and identification.

3.

WIRE ROUTING

The length of wiring to the SPD must be kept at a minimum for the best performance. Wire

lengths should be short, strait runs between the SPD and power source. Wiring impedance

can be further reduced by twisting the phase, neutral and ground conductors together and

routed in the same raceway or channel. Always avoid sharp bends when routing SPD

connecting conductors.

4.

CIRCUIT BREAKER

A dedicated circuit breaker is not required for TPME or TPHE models. However, GE

recommends a 60A rated breaker to serve as a local means of disconnect should the SPD

require servicing or replacement.

5.

REMOTE ALARM CONTACTS

Remote Alarm Monitoring Contacts are provided on all SPD model types covered by this

manual. If this type of monitoring is desired, refer to page 10 for the location and wiring

configuration of these contacts. The contacts are dry, 1 form C type, rated 120 VAC, 1 A (30

VDC, 2A) maximum. Once the SPD has been energized and is operating as intended, the

alarm contacts will switch to “Normal Status”. The contacts will only change back to “Alarm

Status” if there is a failure within the SPD suppression circuitry, or if power has been

disconnected from the SPD. Allowing the Remote Alarm Contacts remain unconnected will

not affect the performance or integrity of the SPD.

6.

PRE-ENERGIZATION CHECK

Once all of the pre-installation conditions have been met and the GE TR7000 SPD has
been installed, the SPD can now be energized. For SPD Operational Status, refer to
Operation and Maintenance Sections

pages 13 & 14.

WARNING

POWER MUST BE PROVEN DISCONNECTED BEFORE STARTING

INSTALLATION, INSPECTION OR MAINTENANCE. FAILURE TO

DO SO MAY CAUSE SERIOUS INJURY, DEATH AND/OR

PROPERTY DAMAGE.

Advertising