GE Industrial Solutions EntelliGuard G Motor Operator User Manual
Page 3
12. To reinstall the cover, rotate the charging
handle down and slide the front cover over the
handle to assemble the front cover to housing as
shown in Fig.
9.
10. Manually charge the springs with the
charging handle and ensure the motor is
assembled properly.
11. Connect the input wire assembly plugs for the
motor and the spring charge status indicator
switch as shown in fig.
8.
13. Ensure the fascia is aligned properly with the
trip unit and the pad lock features of the breaker
14. Fasten the 6 mounting screws of fascia with
the housing using a pozidrive screwdriver. Apply
torque of 6 Nm (4.42 ft-lbs).
Figure
8. Assembly of connectors
Figure
9.
3
9. Assemble the M8 nylock nut at the end of the
camshaft and torque to 12 Nm (8.85 ft-lbs) fig .
7.
Figure
7. Assembly of Nut