Ge energy, Car1812fp series dc-dc converter – GE Industrial Solutions CAR1812FP series User Manual

Page 3

Advertising
background image

GE Energy

CAR1812FP series dc-dc converter

Input: 85Vac to 264Vac; Output: 12 Vdc @ 1800W; 3.3Vdc or 5 Vdc @ 1A

November 1, 2012

©2012 General Electric Company. All rights reserved.

Page 3

12V

dc

MAIN OUTPUT (continued)

Parameter

Device

Symbol

Min

Typ

Max

Unit

Remote ON/OFF delay time

All

40

ms

Turn-ON rise time (10 – 90% of V

out

)

50

ms

Transient response 50% step [10%-60%, 50% - 100%]

(dI/dt – 1A/µs, recovery 300µs)

V

out

-5 +5

%V

out

Programmable range (hardware & software)

10.8

13.2

V

dc

Overvoltage protection, latched
(recovery by cycling OFF/ON via hardware or software)

13.8 15.8

V

dc

Output current V

in

= HL

V

in

= LL

I

out

0
0

150
100

A

dc

Current limit, Hiccup (programmable level)

110

135

% of FL

Active current share

-5

+5

% of FL

STANDBY OUTPUT

Parameter

Device

Symbol

Min

Typ

Max

Unit

Set point

All

V

stb

3.3

/

5.0

V

dc

Overall regulation (load, temperature, aging)

V

stb

-5 +5 %

Ripple and noise

50

mVp-p

Output current

I

out

0 1

A

dc

Overload protection -

Overvoltage protection

Isolation Output/Frame

100

V

dc

Environmental, Reliability

Parameter

Min

Typ

Max

Units

Notes

Ambient Temperature Operating
Altitude Operating
Power Derating

-10

4

70

5

2250

2.5

°C

m

%/°C

Air inlet from sea level to 5,000 feet.
7400 ft
51°C to 70C (60C max where TUV/VDE is required)

Storage
Altitude non-operating

-40

85

8200

°C

m


30,000 ft

Overload Protection shutdown
restart

125

110

°C

Humidity Operating
Storage

30
10

95

95

%

Relative humidity, non-condensing

Shock and Vibration acceleration

6

Grms

NEBS GR-63-CORE, Level 3, 20 -2000Hz, minimum 30 minutes

Earthquake Rating

4

Zone

NEBS GR-63-CORE, all floors, Seismic Zone 4 Designed and
tested to meet NEBS specifications.

Reliability 25C

320,000

Hrs

Full load, MTBF per Bellcore RPP

50C

100,000

Hrs

Full load, MTBF per Bellcore RPP

200,000

Hrs

Full load, demonstrated MTBF

Audible Noise

45

Dba

25C, half load. Fan speed controlled

4

Designed to start at an ambient down to -40°C; meet spec after  30 min warm up period, may not meet operational limits below -10°C.

5

60C max where TUV/VDE is required

Advertising