Figure 3. Terminal board in the meter module.
4. Run wires down the side of the interior.
Determine
the shortest route to the equipment neutral (if
applicable) and ground using the side rails of the
panels. Be sure that the breaker cables will not
interfere with the wires. Attach saddles [4], spaced
approximately 1 foot apart, with tie wraps [3]. Wipe
off the metal with a paper towel or equivalent at the
point of saddle attachment. Use tie wraps [3] to secure
the wires to the saddles.
5. Attach the wire to neutral and ground
. Cut and strip
the free end of the ground wire and attach to the
equipment ground, as shown in Figure 4. Select the
lug hole closest to the metering module. Do the same
for the neutral (if applicable), as shown in Figure 5.
Tighten the screws to the torque levels specified on
the component labels.
Figure 4. Attach the 12-gauge wire to the equipment ground.
Figure 5. Attach the 14-gauge wire to the equipment neutral.
g
GE Industrial Systems
General Electric Company
41 Woodford Ave., Plainville, CT 06062
DEH40394 R02 0901
© 2001 General Electric Company
These instructions do not cover all details or variations in equipment nor do they provide for every possible contingency that
may be met in connection with installation, operation, or maintenance. Should further information be desired or should
particular problems arise that are not covered sufficiently for the purchaser’s purposes, the matter should be referred to the
GE Company.
Terminal
VN
Terminal
GND 6
14-Gauge
Wire
12-Gauge
Wire
Slotted
Screws
Equipment
Ground
Ground
Wire
Equipment
Neutral
Neutral
Wire