Step 3 – install the rotary handle – GE Industrial Solutions Record Plus TDM, NEMA 1, 3R, 12: FE250 User Manual

Page 4

Advertising
background image

Step 3 – Install the Rotary Handle

1.

Drill holes on the enclosure door to

accommodate mounting the handle assembly, as

shown in Figure 9. The handle location on the

door is illustrated in Figure 10. Be sure that the

larger hole in Figure 9 is centered over the end

of the crank assembly or the extension shaft, as

appropriate.

DEH41025

2.

Place the rotary handle assembly [6] on the

door with the locating feature, shown in Figure

11, placed in the small hole drilled in step 1.

Handle to be rotated to OFF position while

locking as shown in Fig10.

3.

Secure the handle assembly to the door as

follows, depending on which kit variant you are

using:

a. For kit FENRN, use the plastic nut [5] to

secure the handle to the door.

b. For kit FENRT, if the length L of the shaft

[9] is less than 9 13/16 inches (250 mm),

use the plastic nut [5] to secure the

handle to the door. If the shaft is longer

than 9 13/16 inches (250 mm), use the

funnel [10] to secure the handle to the

door.

4.

Close the enclosure door and verify that the end

of the crank assembly or the extension shaft, as

appropriate, locks into the center of the handle

assembly, as illustrated in Figure 1.








Figure 10. FENRH handle location on the enclosure

door.



Figure 11. Installing the rotary handle assembly.

Figure 9. Hole pattern for mounting the handle assembly
on the enclosure door.

φ0.24

[6.00]

Center of Top Right

Breaker Mounting Hole

3.15

min

3.15

min

(80.0)

(80.0)

Locating Feature

[6]

[10]

[5]

Advertising