Imagination at work – GE Industrial Solutions EntelliGuard TU Lockout kit for Trip Unit User Manual

Page 3

Advertising
background image


3

Figure E: Re-inserting of Locking Pin


Figure F: Kit Contents

These instructions do not purport to cover all details or variations in equipment nor, to provide contingency to be met in connection
with installation, operation, or maintenance. Should further information be desired, or should particular problems arise which are
not covered sufficiently for the purchaser’s purposes, the matter should be referred to GE.


GE

41 Woodford Ave, Plainville, CT., 06062

www.geelectrical.com

© 2009

General Electric Company

g

Imagination at work

DEH-41688

Advertising