Step 3 – install the rotary handle – GE Industrial Solutions Record Plus TDM, NEMA 1, 3R, 12: FC100 User Manual

Page 4

Advertising
background image

Step 3 – Install the Rotary Handle

1.

Drill holes on the enclosure door to

accommodate mounting the handle assembly, as

shown in Figure 9. The handle location on the

door is illustrated in Figure 10. Be sure that the

larger hole in Figure 9 is centered over the end

of the crank assembly or the extension shaft, as

appropriate.

3.15 min

(80.0)

3.15 min
(80.0)

2.

Place the rotary handle assembly [6] on the

door with the locating feature, shown in Figure

11, placed in the small hole drilled in step 1.

3.

Secure the handle assembly to the door as

follows, depending on which kit variant you are

using:

a. For kit FCNRN, use the plastic nut [5] to

secure the handle to the door.

b. For kit FCNRT, if the length L of the shaft

[9] is less than 9.8 inches (250 mm), use

the plastic nut [5] to secure the handle to

the door. If the shaft is longer than 9.8

inches (250 mm), use the funnel [10] to

secure the handle to the door.


4.

Close the enclosure door and verify that the end

of the crank assembly or the extension shaft, as

appropriate, locks into the center of the handle

assembly, as illustrated in

Figure 1.




Figure 10. FNRH handle location on the enclosure door.

Figure 9. Hole pattern for mounting the handle assembly on the

enclosure door.

Ø 0.236
(6.00)

on Door

Ø1.46

(37.00)

on Door

[5]

[10]

[6]

Locating

Feature

[11]

Figure 11. Installing the rotary handle assembly.

Advertising