System applications, Parallel with utility – GE Industrial Solutions Zenith - Energy Commander Paralleling Switchgear (PSG) User Manual

Page 7

Advertising
background image

Page 7

PB

-2102

10

2

4

6

8

8

12

Noon

11

3

5

7

9

1

ON

OFF

Utility

Purchased Power

Generator

Non-Purchased Power

kW Demand Threshold

Time

kW

> Peak Shave Example

A “Peak Shaving” application is sometimes used to transfer non-critical
loads onto generators during peak utility demand hours.

System Applications

Utility

Generator

Generator

Feeders

Energy Commander
Utility Parallel System

> Con

figuration Example

Parallel with Utility application

Parallel with Utility

> Features

Parallel with utility systems are utilized whenever
generators are to be actively synchronized and
paralleled with utility sources for short or long
durations.

These systems are often also used for standby
use as well.

PSG

controls the generators transfer operations

with the utility source(s) as well as the power
management (loading controls) to direct power
the appropriate direction.

Transfers may occur in short duration (momentary
closed transition), a somewhat longer duration
(softload/unload closed transition), or a sustained
duration (maintained parallel with utility).

Power management in maintained parallel situations
includes controlling import levels from utility, export
levels to utility, or base load levels where generators
are loaded to set amount disregarding the import
and export contribution from utility.

> Components

System combines generators with utility sources.

GE

’s Zenith Energy Commander system controls

load feeder breakers and utility import/export
parallel loading.

Advertising