GE Industrial Solutions Relay Card for GE's GT Series UPS (6&10kVA) User Manual

Page 3

Advertising
background image

Fig. 4

Fig 4: Insert the relay card into the option slot.

Slide the card on the guides on the sides of the slot. Do not attempt to install upside-down – keeping

the screw holes aligned will ensure the correct installation. Secure the card using the screws
removed in the previous step.

Fig. 5

Fig. 6

Fig 5: Sub D-9 Pin configuration

When the Shutdown pin is driven high (connected to 12V) it activates the UPS Shutdown signal. The
Shutdown signal is only effective during a mains failure, when the UPS is operating on Battery. The
UPS will shutdown two minutes after the signal activation.

Fig 6: Connect data cable

Fig. 4

Fig 7: Switch on the UPS

Modifications reserved

3

ISG_OPT_REL_CRD_XGB_V010.doc

Advertising