Asus Z9PE-D16 User Manual

Page 29

Advertising
background image

ASUS Z9PE-D16

2-11

K

J

8. Push down the right load lever (J),

ensuring that the edge of the load

plate is fixed by the lever (K).

9. Insert the right load lever under the

retention tab.

M

L

10. Push down the left load lever (L),

and then insert the lever under the

retention tab (M).

Advertising
This manual is related to the following products: