Installation – Acer X223W User Manual

Page 13

Advertising
background image

X223W

EN-12

INSTALLATION

To install the monitor to your host system, please follow the steps as given
below:
Steps
1. 1-1 Connect Video Cable

a. Make sure both the monitor and computer are powered-OFF.
b. Connect the VGA video cable to the computer.

1-2 Digital Cable (Only Dual-Input Model)

a. Make sure both the monitor and computer are powered-OFF.
b. Connect one end of the 24-pin DVI cable to the back of the
monitor and connect the other end to the computer’s port.

2. Connect power cord

Connect the power cord to the monitor, then to a properly grounded AC
outlet.

3. Power-ON Monitor and Computer

Power-ON the monitor first, then power-ON the computer.
This sequence is very important.

4. If the monitor still does not function properly, please refer to the

troubleshooting section to diagnose the problem.

Advertising