Installation, Attach the i-alert condition monitor to the pump – Bell & Gossett P2000642B i-ALERT Condition Monitor User Manual
Page 10
Advertising
Installation
Attach the i-ALERT Condition Monitor to the pump
CAUTION:
Always wear protective gloves. The pump and condition monitor can be hot.
Tools required:
• 5/32 inch hex wrench
1. Attach the condition monitor to the bearing frame using the hex-head screw provided.
2. Tighten the hex-head screw with a 5/32 inch hex wrench to 6 ft-lbs (8 Nm).
Installation
8
i-ALERT
™
Condition Monitor Installation, Operation, and Maintenance Manual
Advertising