Tools and equipment required before installation – Extron Electronics AVTrac (482) User Guide User Manual
Page 12
Tools and Equipment Required Before Installation
Almost everything you need to install your AVTrac system has been included. You will need some basic tools
and materials depending on the facility and requirements.
Visit
www.extron.com
for a full range of cables and components for populating the connectivity box.
NOTE: All structural steps and electrical installation should be performed by qualified personnel in
accordance with local and national building codes and local and national electrical codes.
Extron recommends the following equipment (not provided) to ensure the AVTrac is properly installed:
¼" Bit for Drilling Metal
Power Drill
Tools for Terminating Cable
Vacuum Cleaner
Miter/Cutoff Saw
(blade for cutting metal)
Safety Goggles
Utility Knives
Hex Nut Drivers
(1/4" and 5/16")
Phillips Head
Screw Driver
Fish Tape
Tape Measure
Level
Zip Ties and Carpet Tape
Marker Pen
Handsaw for
Cutting Drywall
Tin Snips
AVTrac • Before Getting Started
6