Cla-Val X145 Quick Manual User Manual

X145 e-display™ quick start instructions, X145 e-display installation, Required steps for start-up

Advertising
background image

Required Steps for Start-Up

1) Attach display unit to wall using integral mounting tabs

(note: maximum distance from valve 30 feet)

2) Make electrical connections:

• AC Power
• X144 e-FlowMeter™
• Additional outputs (optional)

See page 2 for Wiring Instructions

3) Scale X145 e-Display™ according to scaling

instructions on page 3.

X145 e-Display Kit

The X145 e-Display is shipped ready for installation
with the X144 eFlowMeter™ using AC Power.

The kit contains the following items:

• Loop-powered 4-20mA e-Display
• Enclosure
• Power supply

X145 e-Display™

Quick Start Instructions

for technical assistance, call 800.942.6326

or log-on to www.cla-val.com

X145 e-Display Installation

Figure 1:

Integral Mounting Tabs

How to View Flow Rate and Total Flow

• Once powered, flow rate will automatically be displayed.

To toggle between flow rate and total flow, press the
ACK button.

• To reset totalizer, press the RESET button.
• For more information regarding totalizer, see provided

e-Display™ Instruction Manual.

ACK

MAX

RESET

MENU

e-Display™

Figure 2: e-Display Face

Advertising