Installation, Location, Setup – GEARENCH ZB1260U PETOL Hydraulic Pump Bench User Manual

Page 10: Recommended equipment

Advertising
background image

10

Installation

Location


The Petol Friction Breakout Unit should be located in an area with adequate room to work
the tools. The unit should be located indoors mounted on a finished shop floor. No special
foundation is required.

Setup


Locate the hydraulic power unit in a convenient location and connect the hoses to the
hydraulic cylinder. Cycle the cylinder several times to clear the system of any entrapped air.

Recommended Equipment

The following equipment is recommended for installation and operation. Only one pump is
required. The recommended pumps are of minimum capacity. A larger or more elaborate
pump or power unit may be used.

Installation

kit

Petol

ZI1260-7

Hand

pump

Enerpac

P-84

Power

Team

P159-D

Electric pump (110V)

Enerpac WEM1304B

Power

Team

PE104

Air

pump

Enerpac

PAM-1402N

Power Team PA6D

Hoses (2 each)

Enerpac HC-913 (6 feet long)



Advertising