Installation
Location
The Petol Friction Breakout Unit should be located in an area with adequate room to work
the tools. The unit should be located indoors mounted on a finished shop floor. No special
foundation is required.
Setup
Locate the hydraulic power unit in a convenient location and connect the hoses to the
hydraulic cylinder. Cycle the cylinder several times to clear the system of any entrapped air.
Recommended Equipment
The following equipment is recommended for installation and operation. Only one pump is
required. The recommended pumps are of minimum capacity. A larger or more elaborate
pump or power unit may be used.
Installation
kit
Petol
ZI1260-7
Hand
pump
Enerpac
P-84
Power
Team
P159-D
Electric pump (110V)
Enerpac WEM1304B
Power
Team
PE104
Air
pump
Enerpac
PAM-1402N
Power Team PA6D
Hoses (2 each)