2. Pre-Installation

13

031-032-C2-002 Rev. B

Fig. 2-2 Site Cross Section

2.3

Concrete Pad Installation

1

Undisturbed Ground

2

Compacted Gravel (approx. 12")

3

Concrete Pad (3" to 6" thick)

4

Open area for output power and ground

5

1/2" -13 mounting studs or threaded inserts

6

Open area for utility power sweeps

1

3

2

4

5

6

(Pour-in-place option shown)

7

7

Open area for Generator Interface Kit