Venting, System checks – atwood 8000-II Series Furnace User Manual

Page 3

Advertising
background image

3

be in front of door to furnace. Provide an access opening for service
and/or removal of furnace. The furnace must be side ducted (NO front
discharge). Secure furnace to floor with one screw

FIG

4-J.

5. Remove cover plate from furnace

FIG

4-D. To install duct adapters for

side discharge models, insert back flange over casing and insert tab
into square notch, then twist adapter 180˚

FIG

4-E.

6. Insert furnace into cabinet opening and secure with two screws

through holes in control box flanges

FIG

5-A.

7. For side duct applications, slide 4˝ flexible ducting material over

duct adapters and secure

FIG

3.

VENTING

1. To install extension box

FIG

4-C, apply mastic or sealant to back of

flanges on box. Slide through outside wall cut out and into furnace
air channel.

DO NOT FORCE OR BEND PARTS

.

2. Apply mastic or sealant to the top and sides of outer edge of vent

cap.

DO NOT PLUG HOLES

. Slide assembly over furnace exhaust tube

FIG

4-B, push into wall and secure with two screws. Note that bottom
flange is not sealed to allow water drainage.

3. The extension box has no minimum clearance requirement

FIG

4-C.

4. The vent outlet shall be installed as to be in the same atmospheric

pressure zone as the combustion air intake. No modification of vent
system is allowed.

ƽ

WARNING

CARBON MONOXIDE POISONING

Properly seal vent system preventing carbon monoxide from entering
coach.

5. Install return-air system to ensure negative pressure, created by the

circulating blower, does not effect another appliance’s combustion
air supply or act to mix products of combustion with circulating air.
All appliances in the furnace cabinet must be directly vented outside.

DIRECTIONAL AIRBOX INSERT

(

FIG

.

7

)

1. Remove front door of furnace.
2. Follow shutdown procedure instructions affixed to furnace.
3. Remove sheet metal screw holding circuit board plate to air box.

Retain to fasten Air Box Insert to bottom of air box

FIG

7-A.

4. Install Air Box Insert into air box (pay attention to the direction you

would like warm air diverted). Make sure two holes in Air Box Insert
line up with existing holes in air box

FIG

7-B.

5. Fasten Air Box Insert to top of air box using a 1/4˝ long #6 sheet

metal screw. Fasten bottom of Air Box Insert and circuit board plate
to bottom of air box using the screw removed.

6. Follow lighting instructions to place furnace in operation.
7. Replace front door on furnace.

PROPANE GAS CONNECTION

(

FIG

.

5

)

Connect gas line to brass fitting on left side of furnace. Be sure all
male pipe threads, other than flare fittings, are treated with a sealing
compound resistant to the action of propane (LP) gas.

DO NOT

put seal-

ing compound on flare fittings.

1. Insert gas line through hole on left side.
2. Connect gas line to brass fitting inside furnace casing immediately

ahead of gas control valve

FIG

5-B.

3. A 3/8˝ flared fitting connection is provided at gas control valve inlet for gas

supply connection to furnace. The gas supply line of furnace must be of ade-
quate size to provide 11˝ W.C. gas pressure. This pressure must be main-
tained under maximum flow conditions with all gas appliances operating.

4. A 1/8˝ N.P.T. plug is accessible for test gauge connection on gas

valve assembly

FIG

5-H.

5. Use two wrenches to hold brass fitting and flare nut when tightening

gas line to brass fitting.

DO NOT

twist valve assembly

FIG

6.

ELECTRICAL CONNECTION

ƽ

WARNING

INJURY OR PROPERTY DAMAGE

Label all wires before disconnecting for service. Wiring errors can cause improper,
dangerous operation. Verify proper operation after servicing.

Disconnect electrical power before servicing.

Conductor Sizing Table -

MAX

.

10%

VOLTAGE DROP

-

(12

VDC

)

CURRENT DRAW

(

AMPS

)

3

4

5

6

7

8

9

10

15

GAGE

MAX

.

LENGTH OF SAE CONDUCTOR

(

IN FEET

)

FROM SOURCE TO DEVICE

18

61

45

36

30

26

23

20

18

12

16

96

72

58

48

41

36

32

29

19

ƽ

CAUTION

PROPERTY DAMAGE

This connection is for low-voltage battery or direct current only. Do not
connect to 120- or 240- volts AC.

This furnace is designed for negative ground 12 volts DC only.

DO NOT

attempt to

alter furnace for a positive ground system or connect furnace directly to 120
volts AC. Damage to furnace components will occur and warranty will be voided.

Use a minimum of 22-18 GA wire to minimize voltage drop. The furnace must
be installed so electrical components are protected from water. To make electri-
cal connections:

SEE WIRING DIAGRAM FIG

8

1. Remove screw from junction box on right side of furnace

FIG

5-B.

2. Route wiring to right side of furnace.
3. Connect red wire

FIG

5-C to positive side of power supply.

4. Connect black wire

FIG

5-D to grounded side of power supply.

5. Connect white wire from furnace to thermostat

FIG

5-E.

6. Connect thermostat wire from thermostat to +12VDC of power supply

FIG

5-F.

7. Reinstall junction box cover

FIG

4-F.

For best performance of furnace when power supply is from a converter equipped
with a charging port, wire the converter to furnace parallel with battery. This pro-
vides consistent voltage to furnace, increasing component life, filtering power
surges and AC spikes

FIG

4-G & H.

NOTE

: All units are supplied with a power switch which when turned off for

servicing will remove power through the furnace wiring. Switch must be in ON
position for the furnace to operate

FIG

5-I.

THERMOSTAT INSTALLATION

The thermostat is very sensitive.

HANDLE WITH CARE AT ALL TIMES

. Locate thermostat

48˝ to 54˝ above floor on an

INTERIOR

wall away from areas of abnormal heat or

cold.

EXTERIOR

wall location must have a 3/4˝ spacer between thermostat and

exterior wall.

Follow manufacturer’s installation instruction provided with thermostat. When
thermostat is not supplied, use a thermostat rated for 12 VDC or 24 VAC min. 1 AMP.

DOOR INSTALLATION

Install door by sliding door flange over control box top flange and fastening door at
bottom with 1/4 turn fastener. Note: To assure sufficient return air to circulating
blower maintain specified clearances.

SYSTEM CHECKS

ƽ

WARNING

FIRE OR EXPLOSION

Never check for leaks with an open flame.

PROPANE GAS PRESSURE TEST

The furnace and any individual shut-off valve must be disconnected from gas sup-
ply piping system during any pressure testing of system at test pressures of more
than 1/2 PSI.

Before furnace is connected piping systems must be tested to be leak free. The
test must maintain air pressure of at least 6˝ of mercury or 3 PSI for at least 10
minutes.

The entire piping system must be maintained within a range of 10-14˝ W.C. with
all appliances in operation. Test gas connections for leakage with a leak test solu-
tion.

Advertising
This manual is related to the following products: