Operation engine starting procedure, Using hydrostatic controls – Brown Products Ride-On Blower-Vac (BVZ4000H, BVZ4000SD) User Manual

Page 13

Advertising
background image

OPERATION

Engine Starting Procedure

A. Check Brown Ride-On Blower-Vac to ensure entire machine is

clear of debris and all guards are in place.

B. Ensure airflow dampers are closed.

C. Engage parking brake.

D. Turn ignition to “oN” position.

E. Close choke if engine is cold.

F. Turn key to start engine.

G. As the engine warms, gradually move the choke back to the

open position

Using Hydrostatic Controls

pushing a hydrostatic control lever forward will cause that lever’s corresponding

drive wheel to provide forward movement. The amount of input dictates the

speed of that wheel. The same applies when pulling the lever backward. This

will cause the corresponding drive wheel to provide backward movement with

the speed determined by the amount of input. A top-down drawing of the

hydrostatic controls is provided below.

PAGE 9

Advertising