Bird•b•gone, Step iii: problem analysis, Step iv: installation – Bird B Gone Solar Bird Repeller User Manual

Page 3

Advertising
background image

web site: www.birdbgone.com

E-mail: [email protected]

HOT LINE

800-392-6915

TEL 949-472-3122 • FAX 949-472-3116

BIRD•B•GONE

PRIOR TO INSTALLATION: CHARGE THE REPELLER IN FULL SUN LIGHT

FOR A MINIMUM OF 8 HOURS TO PRE-CHARGE THE BATTERIES

STEP III: Problem Analysis

A. Before operation, observe the birds and

inspect the affected areas.

Eliminate any variables that coud be

attracting birds including food, water and

shelter. Eliminating these variables increases

the success of your bird abatement program.

B. Ensure a Clean Environment.

Prior to installation, make sure all areas

are cleaned of bird feces using commercial

disinfecting cleaning agents. Using

disinfectants / cleaning agents reduces

exposure to airborne diseases caused by bird

feces. For recommendations or questions

regarding disinfectants, call Bird•B•Gone

Technical Assistance at 1-800-392-

6915; E-mail: [email protected].

STEP IV: Installation

A. Solar Panel Alignment

Be sure that the Solar Panel is facing South.

It must be in a position to receive the maximum

amount of light.

DO NOT USE UNTIL THE SOLAR PANEL HAS

BEEN IN THE SUN FOR A MINIMUM OF 8

HOURS TO PRE-CHARGE THE BATTERIES.

For best results, try to position the solar panel in

areas that have direct sunlight the entire day.
The solar panel can be

adjusted by loosening

the screw, choosing the

position and re-tightening

the screw again.

B. Telescoping Wands: Pull out Telescoping

Wands / Arms to desired Length

( up to 2.5’ each).

Optional: Tie Mylar tape to the ends of

the Telescoping Wands.

Advertising