Final Steps


Insure that all areas are securely bonded. Sandbag any areas where needed to

insure bond in seams, edges, or any potential problem area.

Mark off the area to keep traffic off for at least 12 hours, and do not allow heavy
foot traffic for a minimum of 24 hours, 72 hours is best if possible.


Permit no heavy equipment or rolling loads for 72 hours.

Protect from other construction by covering until construction is complete.


Do not perform maintenance for 72 hours.

Maintain 65-75 degrees F for the next 48 hours.


Inspect the floor 2.5 hours after installation; roll a 3

rd

time if necessary.