NOTE: When inserting the hitch weigh bar, be sure that the TOP decal on the spindle is facing upward. When Inserting

the remaining four weigh bars, be sure that the TOP decal on the spindle is facing downward. Failure to correctly align

the weigh bar and spindles in the upright position will cause the scale system to read with greater inaccuracy.

Installation of Scale System

for Grain Carts Equipped with Tracks, Dual Wheels or Single Wheel

Single Wheel or Track

Grain Cart Layout Diagram

Scale packages for grain carts equipped with Tracks and Single Wheels feature a

five point system that includes five hitch weigh bars only. A five point junction box is

used for all scale systems on grain carts equipped with tracks and Single Wheels.

Walking Tandem Dual

Wheel Layout Diagram

Scale packages for grain carts equipped with Walking Tandem Dual Wheels

feature a five point weigh system that includes four weigh spindles and one hitch

weigh bar. A weigh system with a five point junction box is used on all scale

systems for grain carts equipped with walking tandem dual wheels.

Front Legs of

Grain Cart

Weigh Spindles (Insert Adapter Tubing Pipe)

(typical each side)

Battery Box

Indicator Box

Junction Box

Secure Weigh Bar Weldment to rear

A-frame hitch plate using 4 3/4” x

3” bolts with heavy lockwashers and

nuts. Bolt hitch to weigh bar and

secure to rear Weigh Bar Weldment

using existing 1” x 4 1/2” Grade 5

Bolt with nut.

Run Weigh Spindle wires out of

grommet and through the wire chan-

nel accross to the Junction Box.

Run Weigh Spindle wires out of

grommet to the Junction Box.

Run Hitch Weigh Bar Wire out of tubing frame at

front grommet and connect to Junction Box.

Secure Weigh Bar Weldment to rear

A-frame hitch plate using 4 3/4” x

3” bolts with heavy lockwashers and

nuts. Bolt hitch to weigh bar and

secure to rear Weigh Bar Weldment

using existing 1” x 4 1/2” Grade 5

Bolt with nut.

Battery Box

Indicator Box

Junction Box

Weigh Bars

(typical each side)

Models 1000 and Lower

Front Legs of

Grain Cart

Insert Weigh Spindle wires through

adjacent grommet and run inside

tubing to grommet shown.

(typical each side)

Run Hitch Weigh Bar Wire out of tubing frame at

front grommet and connect to Junction Box.

Run Weigh bar

wires out of grom-

met and through

the wire channel

accross to the Junc-

tion Box.

Insert Weigh Bar wires through

adjacent grommets and run inside

tubing to grommet shown.

(typical each side)

Run Weigh Bar wires

out of grommet to the

Junction Box.

Insert Weigh Bar wires through

adjacent grommets and run inside

tubing to grommet shown.

(typical each side)

Run Weigh Bar wires out of tubing

frame at front grommet and through

cross tube as shown. Then connect

the wires to the Junction Box