J&M JD-STS 60 series User Manual

Page 4

Advertising
background image

SET-UP INSTRUCTIONS

Tip Up Kit for 2007 John Deere Combine 60 Series Factory Installed Extensions


Step 4 Connect the side tip up panels between the rounded corner tip up panels using the lynch pins

provided. Center and adjust the panels as necessary. Align the hinges on the front and rear tip
up panels with the top edge of the existing tank panels. Drill 3/8” holes at each hinge hole
location and secure to the existing tank side panels using 5/16” x 5/8” bolts and 5/16” lock nuts. If
necessary, apply rubber foam adhesive strip to the back side of the corner tip up panels to
eliminate any gaps between panels.


Step 5 Remove the existing combine baffle brace. Install the tank brace support using the existing bolts

from the baffle brace. Position the top end of the tank brace underneath the existing tank
extension frame. Slide the top portion of the brace up against the tank frame for additional
support and secure by tightening the 3/8” x 1” flange bolt and 3/8” flange nut.


Step 6 Place the sensor bracket on an appropriate tip up panel at the desired location. Mark and drill

3/8” holes and secure to the tip up panel using 5/16” x 5/8” bolts and 5/16” lock nuts. Relocate
and secure the sensor to the bracket.

Advertising